Comfortable Aesthetic Newly
We Build Modular
We present new designs reflecting professional, innovative, and modern styles in house models of LeoDom that is ready-made house specialist. We have no doubt that you will be satisfied with the production quality, aesthetics, and comfort of our ready-made houses, which we produce in our modern production facilities by using high technology with an fully bolted (no welding) system.
Choose Your House
We established the world’slargest prefabricated city in Iraq.
Exporting to more than 120 countries, has carried out the world’s largest prefabricated project in Baghdad, the capital city of Iraq, and in Kut, at once. The project included 1884 residences and 16.148 m2 social facility buildings, has a total size of 174.148 m2. It is the world’s largest prefabricated building project completed at once. In addition to the residences built within the scope of this project, there are social facility buildings in the complex, such as the municipality building, school, hospital, shopping center,
We completed a project with 900 social houses in 3 months in Congo
We produced 900 houses in total for the three-stage project, established in Kinshasa, the capital of the Democratic Republic of Congo as 600 residences of 51 square meters in 2 + 1 plan at the first two stages, and 300 houses with 91 square meters at the third stage.
We delivered the earthquake resistant steel school with 19 classrooms in 72 days.
Why Us?
Economic
Reliable
Long lasting
Instulated
High Tech
Secure
Eco Friendly
customer-centric
Export
Our Responsibility
Jobs under responsibility of our customers: ground concrete, all kinds of excavation works and landscaping; floor and walls covering works (screed, tiles, laminate flooring etc.); permissions required for the building to be erected; the grounding line between the structure and the ground concrete; external connection outside the building (electricity, wastewater and clean water, meters); heating and cooling installations (heaters, air conditioners, stoves, etc.); meeting the accommodation and meal expenses of the assembly team; protection of materials at the assembly site; kitchen lower and upper cabinets